Can I actually build an ADU on my lot?

California law made this question much easier to answer. What it did not do is make every lot the same.

By , licensed CA General B #1112902 · Updated October 2026

Home  /  Guides  /  ADUs
Short answer

For most single-family lots in Santa Clara and San Mateo counties, the answer is yes: state law has made ADUs broadly permissible. So the useful question is no longer am I allowed, it is where does it physically fit, and what will the utilities cost. Those two answers come from your rear-yard space after setbacks, access for equipment and utility runs, and whether your electrical service can carry another dwelling. That is a per-parcel answer, and it is worth getting before you pay anyone to draw anything.

Why “am I allowed” is usually the wrong question

California has spent several years removing local barriers to ADUs. The practical effect is that outright prohibition is now rare, and the constraints that decide your project are physical and financial rather than permissive.

Which is genuinely good news, because physical constraints can be measured. We would rather walk your lot for an hour and tell you the honest answer than have you spend $10,000 on plans for something the site cannot take.

The four things that actually decide it

  1. Rear-yard space after setbacks

    Not your total lot size, the usable rectangle left once setbacks are applied. This is the constraint that most often shrinks a project from what the owner pictured.

  2. Access

    How do materials, concrete and equipment reach the back of the property? A narrow side yard, a mature tree, a neighbor's fence line or a slope all add real cost. On some lots everything gets carried by hand, and that shows up in the number.

  3. Utilities and distance

    Water, sewer and electrical have to get there. The further the run and the more hardscape it crosses, the more it costs. Trenching through a finished driveway is not the same job as trenching through lawn.

  4. Electrical service capacity

    Adding a dwelling can push an older service past what it can carry. If it does, a service upgrade comes first, before anything else happens. This is the item that most often surprises people, and it is checked at the site visit rather than discovered at inspection.

Detached, attached, garage conversion or JADU

Which ADU type usually fits which lot
TypeNeedsUsually chosen when
DetachedRear-yard space, access, new foundation, utility runsThere is real yard to work with and privacy or rentability matters
AttachedSpace alongside the house, new foundation, shorter utility runsThe yard is tight but there is room on a side or rear elevation
Garage conversionAn existing garage; usually slab remediation rather than a new foundationThe cheapest route to a real unit; the slab and the ceiling height are the usual sticking points
Junior ADU (JADU)Space inside the existing houseSmallest scope and fastest path; no new footprint at all

What it costs, and why we do not publish a per-square-foot number

A good-quality ADU in our area runs $300K–$360K for a good-quality build. We publish that as a project range and never as a rate per square foot, and the reason is arithmetic rather than coyness.

Roughly $13,500 to $18,500 of soft costs are fixed no matter how small the unit is: plans around $10,000, survey and certification about $3,000, and soils work from $4,500. A 400 sq ft unit therefore is not two-thirds the price of a 600 sq ft one. The effective rate per foot rises as the unit shrinks. Any contractor quoting ADUs off a flat multiplier has not priced one properly.

Ask every city about AB 1332

Since 1 January 2025 every California city and county must run a pre-approved ADU plan programme and must approve or deny a ministerial application using a pre-approved plan within 30 days. Where a plan fits your lot, most of the architectural set is already drawn and the city's decision shrinks to a 30-day clock; the site-specific sheets, utilities and construction keep their own schedule. It is worth asking before anyone starts drawing.

How to get a real answer in one visit

Bring whatever you have: a plot plan, an old survey, a photo of your electrical panel. We will look at the rear yard against setbacks, walk the access route, find where the utilities come in, and open the panel. That is normally enough to tell you which ADU type your lot actually supports and roughly what the site conditions will add.

If the answer is that your lot is a poor candidate, we would rather tell you on that visit than after you have paid for drawings.

Where to start, and what happens next

Most people who search for this are not asking a zoning question. They want to know what the first move is and who does what. Here is the whole path on an ADU built with us, in the order it actually happens.

  1. Decide what the unit is for and name the parcel

    Rental, a parent, an office, resale value later. The use drives the size, the kitchen and the entry, and it is the first thing we ask. Have the address ready so we can read the lot and the city rules before we talk.

  2. Book a Project Discovery Call

    A 20 to 30 minute video call. Bring whatever you have: a sketch, photos of the yard and the electrical panel, any plans, and your budget range. We tell you on that call whether the lot and the budget line up and what the site visit needs to settle.

  3. Site visit

    We measure the usable yard after setbacks, walk the utility route to the street, open the panel and look at access for equipment. If the lot is a poor candidate we say so here, before anyone pays for drawings.

  4. Plans: your architect and engineer, coordinated by us

    We are the builder, not the designer. We coordinate the architect and structural engineer who produce the stamped permit set with Title 24, or we start from a pre-approved plan where your city has one that fits. Either way the site-specific sheets still get drawn.

  5. The proposal, walked line by line

    Every scope line, allowance and exclusion in writing, reviewed with every decision-maker on a call before anything is signed. Site conditions, utilities and selections are named as the items that move the number.

  6. Permits and the schedule

    We submit to the city and carry plan-check corrections. The schedule is built on dependencies, not wishes: plan check, utility applications and material lead times set the start, and inspections set the milestones.

  7. Foundation, envelope, trades, inspections

    Foundation and framing, then roof and windows, then electrical, plumbing and mechanical rough-in, each with its city inspection before anything gets covered.

  8. Finishes, final inspection, closeout

    Drywall, floors, kitchen and bath, paint. The permit is finalled, you get the closeout package and the warranty terms in writing.

  9. What you receive along the way

    A daily log with photos from the site, the live schedule, invoices tied to milestones and change orders in writing before the work, all in one client portal.

The pages that go with this: what we build and what an ADU costs, the San Jose cost breakdown, how long an ADU takes, garage conversions, pre-approved plans and AB 1332 and finished projects. In San Jose the city's own ADU page is the official source for its process and pre-approved plans: sanjoseca.gov, Accessory Dwelling Units. Every other city we serve publishes its own, and we read the right one for your parcel.

Start here

Book a Project Discovery Call with your address and your budget range. We serve Santa Clara and San Mateo counties.

Common questions

How much yard do I need for a detached ADU?
Less than most people assume, but the number that matters is the usable space after setbacks, not your lot size. Two lots of identical size can give completely different answers depending on where the house sits. This is genuinely a per-parcel question and it is the first thing we check.
Do I need a separate electrical service for an ADU?
Usually its own subpanel rather than a separate service. The question that matters more is whether your existing service can carry the additional load at all. Older 100-amp services often cannot once another dwelling is added, and then a service upgrade becomes the first item in the project rather than an afterthought.
Can I rent it out?
Long-term tenancy is generally the point of the state ADU laws. Short-term rental rules are set locally and vary city by city, so check your own city's ordinance before you build a plan around that income. We build the unit; we do not advise on how you let it.
Is a garage conversion cheaper than building detached?
Almost always, because you already have a slab, walls and a roof. The two things that catch people out are the condition of the existing slab, which frequently needs remediation, and the ceiling height once the floor is built up. Replacement parking is not one of them: state law bars a city from requiring you to replace the garage parking you convert to an ADU (Gov. Code 66314(d)(11); HCD ADU Handbook, March 2026, p. 33).
Do you design the ADU?
We are a builder, not a design firm, but that does not mean you are on your own for plans. We coordinate the architect and structural engineer who produce your stamped permit set including Title 24, and that work is a line item we price and manage. On ADUs we can also start from a standard design, which is usually the faster and cheaper route.

Where to go next

Written by the team at Elusive Construction, a licensed California general contractor (B #1112902) building in Santa Clara and San Mateo counties. General information about how residential construction works, not legal advice. For your specific contract, talk to an attorney.

Have a project you want priced honestly?

Book a Project Discovery Call and we'll tell you what's realistic on scope, budget and timeline, even if we're not the right builder for it.