Guides
Straight answers about building in California
The questions homeowners actually ask us — answered properly, including the ones where the honest answer costs us money.
Most contractor websites answer one question: what does it cost. That is usually the last thing a homeowner needs to know and the first thing everybody publishes.
These pages answer the questions that come earlier and matter more — whether a deposit request is legal, why two bids on the same yard came back $80,000 apart, what a change order is supposed to look like before you sign it. Some of the answers work against us commercially. We publish them anyway, because a homeowner who understands how the work is priced is a better client than one who doesn't, and because it is the truth.
Every number here comes from our own projects or from California law, and where we don't know something — a specific city's permit fee, a size limit that varies by jurisdiction — we say so rather than guessing. Written by a licensed general contractor building in Santa Clara and San Mateo counties.
Your contractor asked for 50% up front. Is that legal?
Short answer: no. And of every warning sign on a residential job, this is the one that costs homeowners the most money.
ADUsWhy two ADU quotes can be $80,000 apart
Two builders walk the same yard and come back $80,000 apart. Usually neither one is lying. They are quoting different scopes, and the difference is mostly in the work that happens before anyone breaks ground.
ADUs · California LawYour city has to offer pre-approved ADU plans now
A state law that took effect in January 2025 changed the ADU permitting math, and most homeowners — and a fair number of builders — still don't know it exists.
During ConstructionWhen should you refuse a change order?
Change orders are normal. Change orders you find out about after the work is done are not, and the difference is entirely about when the paperwork happens.
Hiring a ContractorHow to check a contractor's license before you sign
It takes two minutes and it is the single highest-value thing you can do before handing anyone money.
During ConstructionYour builder found something unexpected. What should happen next?
Almost every renovation runs into something nobody could see. The discovery isn't the problem — what happens in the next 48 hours is.
Trades & SubcontractorsHow roofing gets handled on your project
Short version: it gets done, by someone licensed for it, sequenced so it lands before interior finish.
Tell us about your project
Book a Project Discovery Call and we'll tell you what's realistic — scope, budget and timeline — whether or not we're the right builder for it.