Remodeling, By A Builder
Bathroom Remodeling
The part of a bathroom that decides whether it lasts fifteen years or leaks in three is the part you never see.
- Licensed CA General B #1112902
- Fully Insured
- Santa Clara & San Mateo Counties
The short answer
A bathroom remodel in San Jose typically runs $22K–$30K typical, and $20,000 is our floor — taken to the studs and waterproofed properly. We do not bid the $10,000 version, because the part that decides whether a bathroom lasts fifteen years or leaks in three is the part you never see: the waterproofing behind the tile. If you are comparing quotes and ours is higher, the question worth asking the other bidder is which waterproofing system is included and who inspects it before the tile goes on. Moving the toilet, tub or shower means moving drain lines, which is the single biggest swing in a bathroom budget.
- Licence
- CA General B #1112902
- Bond & insurance
- $25,000 bond, insured
- Permits
- We pull and close them
- Where
- Santa Clara & San Mateo
Waterproofing is the whole job
Every failed bathroom we've opened up failed the same way: water got behind the tile because the substrate and the waterproofing were wrong. Tile is not waterproof. The membrane behind it is, and that is where cheap bids save their money.
We take bathrooms to the studs so the framing and subfloor can actually be inspected, fix what the water already did, then rebuild with the substrate and waterproofing done to spec. It costs more than a surface refresh. It also doesn't come apart.
Scope
What a bathroom remodel involves
Demolition to the studs
So framing, subfloor and any existing water damage can be seen rather than guessed at.
Structural repair
Rotted subfloor and framing replaced before anything new goes over it.
Plumbing & electrical
Supply, drain and venting brought to current code while the wall is open, with GFCI protection and proper exhaust.
Waterproofing
Correct substrate and a continuous waterproofing membrane at the pan and surround. The invisible part that decides everything.
Tile & fixtures
Set on a surface that was made flat first, with slope to drain that actually drains.
Finishes & walkthrough
Vanity, glass, paint and trim, then a punch list walked together.
Where a bathroom budget actually goes
| Choice | Effect on cost | Why |
|---|---|---|
| Fixtures stay where they are | Lowest | No drain relocation |
| Move the vanity | Small | Supply and drain move a short distance |
| Move the toilet | Significant | The drain line and often the subfloor have to change |
| Tub to walk-in shower | Moderate | New pan, waterproofing and drain height |
| Second-storey bathroom | Adds scope | Access to the drain runs through the ceiling below |
| Waterproofing system | Not optional | The failure point; it is inspected before tile |
| Niches, benches, glass | Moderate | Each is a separate waterproofing detail |
Common Questions
Straight answers
What does a bathroom remodel cost in San Jose?
How long does a bathroom take?
Can you just re-tile without the demolition?
Why is your floor $20,000 when I have been quoted $12,000?
How long does a bathroom remodel take?
Can you move the toilet?
Do I need a permit for a bathroom remodel?
Are you licensed, bonded and insured?
Do you handle the design?
On ADUs we can also start from a standard design and give you a materials list, which is usually the faster and cheaper route.
What we won't do is sit and choose your layout, cabinet doors and finishes with you. That is interior design, it is a real skill, and it isn't ours — if that's the help you want we'll say so up front rather than three weeks in.
How do allowances work?
Process
How a bathroom remodel actually runs
Scope and the fixture question
Whether fixtures stay where they are decides most of the budget. Moving a vanity is small. Moving a toilet means opening the subfloor and sometimes altering framing — on an upper floor, through the ceiling below.
Selections before demolition
Tile, fixtures and glass get chosen and on site before we open anything, because a bathroom is a small room where one missing item stops every trade.
Demolition to the studs
Our floor is $20,000 because this is where it starts. You cannot waterproof correctly over someone else's guesswork.
Rough plumbing, electrical, inspection
Drain and supply relocations, circuits, ventilation. Then an inspection hold, before anything is covered.
Waterproofing and its inspection
The part that decides whether the room lasts fifteen years or leaks in three. It is inspected before tile goes on, and that sequence is not negotiable — it is also the honest answer to why a cheaper bid is cheaper.
Tile, fixtures, glass, punch list
Tile, then fixtures, then glass measured to the finished opening. Final inspection where permitted, then a walked punch list.
Deposit is capped at $1,000 by California law. Milestone draws follow the work — see how payments work.
Before you sign anything
Worth reading first
- What a failed inspection actually costsWaterproofing is inspected before tile for a reason.
- Your contractor stopped showing upWhat a replacement builder needs from you.
- Is a 50% deposit legal in California?No. $1,000 is the cap.
- Will your remodel trigger a panel upgrade?The most common found-after-demo cost, and the check that prevents it.
Service Area
Where we build
Permit process, plan check and utility requirements change at every city line. Each page covers what's actually true where you're building.
Tell us about your project
Book a 30-minute discovery call and we'll tell you what's realistic — scope, budget and timeline — whether or not we're the right builder for it.