Santa Clara County
General Contractor in Saratoga
New construction, ADUs, additions and whole-home renovations — built and permitted by a licensed general contractor working in Saratoga.
- Licensed CA General B #1112902
- Fully Insured
Building in Saratoga
Every city in our area is its own jurisdiction with its own review process. What's true in one does not carry across the city line — which is why this page exists rather than a single generic service-area page.
Saratoga is large-lot and heavily wooded, which means tree protection and grading are usually part of the conversation. Larger parcels give real room for additions and ground-up work — with site work that has to be priced honestly.
In Saratoga the trees do not just sit near the job, they define where the job can happen. Arborist review and a written arborist report are required any time construction is proposed under, or within five feet of, the canopy dripline of a protected tree — and that expressly includes trees on your neighbour's property. You hire the arborist, the report goes to the City, and you pay a deposit for the City's own review of it. It applies to building permits and to residential design review alike.
The detail that catches crews out is what counts as construction. The City's definition includes grading, parking vehicles, and storing materials or equipment inside a protected root zone. On a wooded Saratoga lot that can remove the obvious place to put the dumpster, the lumber drop and the crew trucks — which is a site logistics problem, and it is cheaper to solve on paper than on day one. Tree protection fencing has to be up before any equipment comes on site and inspected by the project arborist. Even paving within five feet of a dripline needs its own tree encroachment permit from the City Arborist.
Slope quietly shrinks how much house you are allowed. Floor area, lot coverage and density are all calculated from net site area, not the gross number on the deed. Easements come off it, a surveyor has to establish average slope on any lot over 8%, and average slope above 10% reduces the net site area used for the floor area allowance. So on a sloping wooded parcel the buildable number can land well under what the lot size suggests. Establish it before design, not after.
One recent change worth knowing. Saratoga's updated tree ordinance, effective 6 March 2026, lets homeowners citywide remove a tree whose trunk sits within five feet of the house to reduce wildfire risk, without the public notification and appeal process, provided a non-flammable zone within that five feet is established and maintained. A City tree removal permit is still required. In the Wildland-Urban Interface it also eases replacement requirements on development projects, and permit fees are waived for dead or fallen trees and for Monterey pine and blue gum eucalyptus in the WUI when you submit photos. The City Arborist is at 408-868-1276 and is worth a call before a plan is drawn.
We work throughout Saratoga — whether you're in Saratoga Village on Big Basin Way, the Saratoga foothills, the Hakone Gardens area, or the Argonaut neighborhood, the build is the same standard.
Permits. Work in Saratoga is permitted through the City of Saratoga's building department. We carry the submittal and the plan-check corrections — that is our job, not yours.
What Fits Here
What we build in Saratoga
New Construction
New Construction in Saratoga, built and permitted by a licensed general contractor.
Learn more →ADUs
ADUs in Saratoga, built and permitted by a licensed general contractor.
Learn more →Home Additions
Home Additions in Saratoga, built and permitted by a licensed general contractor.
Learn more →Whole-Home Remodels
Whole-Home Remodels in Saratoga, built and permitted by a licensed general contractor.
Learn more →Budget
What a Saratoga project costs
We publish our real ranges rather than making you book a call to find them out, and our minimum project size is $20,000. What moves a number in Saratoga is rarely the finishes — it is the site, the utilities and what turns up once something is opened.
Public record
Permits and ADU rules in Saratoga
These are links to the city's own pages, not our summary of them. We carry the submittal and the plan-check corrections on a project we build, so this is not information you have to act on yourself. It is here because you should be able to check it either way.
Saratoga takes building permit submittals by email to its Building Department, and its pre-approved ADU program was set up specifically to comply with AB 1332.
Pre-approved ADU plans. Saratoga publishes a gallery of pre-approved ADU plans that homeowners can build from. Since AB 1332 took effect on January 1, 2025, California cities have had to run a pre-approved ADU plan program and post the approved plans publicly. Where a usable plan exists it can take real time and design cost out of a project, because the design has already been reviewed and only the site-specific work is left.
Links checked August 2026 and pointing at government pages. Cities change both their pages and their rules, so confirm anything current with the City of Saratoga's building department. We deliberately do not publish Saratoga permit fees or review times here: those move, they vary by project, and a number that is out of date is worse than no number at all.
Common Questions
Straight answers
Do you build in Saratoga?
Do you handle the Saratoga permit process?
What does building in Saratoga cost?
Before you hire anyone
Worth knowing before you sign in Saratoga
- The same project is a different project in each of these 16 cities What actually changes at a city line, Saratoga included — hearings, tree permits, fire districts and the thresholds nobody mentions.
- How big a deposit can a contractor legally ask for? California caps it at $1,000. Most people are asked for far more.
- How to check a contractor's license before you sign The CSLB lookup, and what a suspended bond actually means.
- Change orders and allowances, explained Where a fixed price stops being fixed, and what should be in writing.
- Why two ADU quotes can be $80K apart Fixed soft costs are most of the answer.
- Can I build an ADU on my lot? Setbacks, access, utilities and service capacity — a per-parcel answer.
- What changed in California ADU law on 1 January 2026 Saratoga now owes you a completeness decision in 15 business days, or the application is deemed complete.
- How big can my ADU actually be? State law caps how small Saratoga is allowed to cap you — 850 sq ft, or 1,000 with more than one bedroom.
- The inspection found unpermitted work. Now what? Three routes, and the one question to settle before you negotiate.
Nearby
Other cities we build in
Building in Saratoga?
Book a 30-minute discovery call and we'll tell you what's realistic — scope, budget and timeline — whether or not we're the right builder for it.