Our Lead Trade
Ground-Up Home Construction
Building a house from raw land is a different job than remodeling one. It's the work we're built around — and the work we'd rather be doing.
- Licensed CA General B #1112902
- Fully Insured
- Santa Clara & San Mateo Counties
The short answer
Ground-up home construction in Santa Clara and San Mateo counties starts at From $500/sq ft — and that rate describes new construction only, not remodels or ADUs. We are a licensed General B builder, so we hold the whole job: foundation, framing, every trade, and the permit from application through final inspection. We do not design your house, but we are not handing you a homework assignment either — we coordinate the architect and structural engineer who produce your stamped permit set, and that work is a line item we price and manage. Expect roughly 14–24 months from first drawing to keys, with plan check the least predictable part.
- Licence
- CA General B #1112902
- Bond & insurance
- $25,000 bond, insured
- Permits
- We pull and close them
- Where
- Santa Clara & San Mateo
One contract, from dirt to final inspection
A ground-up build has more moving parts than any remodel: site work, utilities, foundation, framing, three or four inspection cycles, and a finish schedule that has to land in the right order or it costs you twice. We carry all of it under one contract, so there's one company accountable when something needs a decision.
We're a builder, not a design firm. If you already have plans and an engineer, we price and build from them. If you don't yet, we'll tell you honestly what you need and point you at someone good — that's a better outcome than us pretending to be architects.
Scope
What's in a ground-up build
Feasibility & site review
Before anything is drawn, what the lot will actually allow — access, utilities, slope, soils and setbacks.
Permits & plan check
We carry the submittal and the corrections. Plan check comments are normal; chasing them is our job, not yours.
Site work & foundation
Grading, utility trenching, forms and foundation, with special inspections scheduled where the engineer calls for them.
Framing & dry-in
Structure, sheathing, weather barrier, windows and roof — getting the building watertight before anything finish-grade goes in.
Systems rough-in
Electrical, plumbing and mechanical roughed and inspected before the walls close.
Finish & walkthrough
Interior finish, exterior, punch list, and a walkthrough that isn't over until you say it is.
Building new versus remodelling what is there
| Build new | Whole-home remodel | |
|---|---|---|
| What you are paying for | Everything, from the soil up | Keeping what works, replacing what doesn't |
| Published range | From $500/sq ft | $130K–$490K |
| Layout freedom | Total — the plan is yours | Bounded by the existing structure |
| Surprises after demolition | Few — nothing is hidden yet | The main schedule and budget risk |
| Permit path | Full plan check | Depends how much structure moves |
| Typical timeline | 14–24 months incl. design and plan check | 6–12 months |
| Best when | The existing house is not worth keeping | The bones are sound and the layout is the problem |
Common Questions
Straight answers
Do I need plans before you can price a new home?
How long does a ground-up home take?
Do you handle the roof?
How long does it take to build a house in Santa Clara County?
Do I need an architect, or can you handle the drawings?
Is it cheaper to tear down and rebuild or to remodel?
What happens if the soil report comes back bad?
Are you licensed, bonded and insured?
Do you handle the design?
On ADUs we can also start from a standard design and give you a materials list, which is usually the faster and cheaper route.
What we won't do is sit and choose your layout, cabinet doors and finishes with you. That is interior design, it is a real skill, and it isn't ours — if that's the help you want we'll say so up front rather than three weeks in.
How do allowances work?
Process
How a ground-up build actually runs
Feasibility and budget reality
Before anyone draws anything we look at the lot, the utilities and what you actually want, and tell you whether the budget and the ambition are in the same postcode. This is the cheapest hour in the whole project and the one that saves the most money.
Design and engineering
We coordinate the architect and structural engineer who produce your stamped permit set including Title 24. That is a line item we price and manage, not homework we hand you. Soils work happens here too, because the foundation design depends on it.
Permit and plan check
The set goes to the city. This is the least predictable stretch of any project and it runs on their queue, not ours. We handle the submission and the comment cycles; what we will not do is promise you a date the city controls.
Site work and foundation
Clearing, grading, utilities and the foundation. Once concrete is in, the shape of the house is fixed — which is why the decisions before this point matter more than the ones after it.
Framing, dry-in, rough trades
The house goes up, gets weather-tight, and then electrical, plumbing and mechanical go in while the walls are still open. Two inspection holds live here and they are the expensive ones to fail.
Finishes and close-out
Insulation, drywall, cabinetry, floors, fixtures. Then final inspections, the permit gets finalled, and we walk a punch list together before you take it.
Deposit is capped at $1,000 by California law. Milestone draws follow the work — see how payments work.
Before you sign anything
Worth reading first
- Foundation cracks: when it's an engineer's questionBefore you build on, or buy, an existing foundation.
- What a failed inspection actually costsMostly schedule, not fees — and which stages are the expensive ones.
- Is a 50% deposit legal in California?No. $1,000 is the cap, on a job of any size.
- Architect, designer, or just a builder?Which one you need first, and the expensive mistake of hiring out of order.
Service Area
Where we build
Permit process, plan check and utility requirements change at every city line. Each page covers what's actually true where you're building.