Elusive Construction logo Elusive ConstructionLic #1112902
Home under construction with the Elusive Construction site sign

Santa Clara County

General Contractor in Campbell

New construction, ADUs, additions and whole-home renovations — built and permitted by a licensed general contractor working in Campbell.

  • Licensed CA General B #1112902
  • Fully Insured
Home  /  Campbell, CA

Building in Campbell

Every city in our area is its own jurisdiction with its own review process. What's true in one does not carry across the city line — which is why this page exists rather than a single generic service-area page.

Campbell is a small city with its own building department and a lot of older housing stock. On homes of that age, what we find once walls are open — knob-and-tube remnants, undersized panels, unpermitted prior work — drives the budget more than the finishes do.

Going up in Campbell is a public hearing, and the size threshold is lower than people assume. A new two-storey house or a second-storey addition generally needs a Site and Architectural Review Permit, and the City's own Planning Commission notices show additions in the 500 to 600 square foot range being heard. So “it is only a small second storey” is not a reason to expect an over-the-counter permit here. Build the hearing into the schedule from the start rather than discovering it at submittal.

Check whether your house is on the Historic Resource Inventory before you design anything. Plenty of Campbell owners are on it and do not know. The good news, from the City's own FAQ: being listed does not stop you remodelling or adding on, it costs you nothing to be listed, and it does not raise your property taxes. There may even be a property tax benefit tied to a remodel, which is worth asking the City about directly.

What listing does change is the review path, and it is a two-step one. At building permit application, Planning checks the drawings against the City's Historic Design Guidelines. If the Community Development Director finds them consistent, that is the end of it and the permit can issue. If the Director finds them inconsistent, the project goes to the Historic Preservation Board for a decision. Interior work is largely unaffected, provided it does not alter the architectural character. The practical read: design in the style of the house from the first sketch and you stay on the fast path. Design against it and you will be in front of a board explaining why.

We work throughout Campbell — whether you're in Downtown Campbell on Campbell Avenue, The Pruneyard, West Campbell, or San Tomas, the build is the same standard.

Permits. Work in Campbell is permitted through the City of Campbell Community Development / Building Division. We carry the submittal and the plan-check corrections — that is our job, not yours.

Budget

What a Campbell project costs

We publish our real ranges rather than making you book a call to find them out, and our minimum project size is $20,000. What moves a number in Campbell is rarely the finishes — it is the site, the utilities and what turns up once something is opened.

Work out a range for your project

Public record

Permits and ADU rules in Campbell

These are links to the city's own pages, not our summary of them. We carry the submittal and the plan-check corrections on a project we build, so this is not information you have to act on yourself. It is here because you should be able to check it either way.

Every Campbell permit application goes through MyGovernmentOnline, and you need an account on that platform before you can submit anything at all.

Pre-approved ADU plans. Campbell publishes a gallery of pre-approved ADU plans that homeowners can build from. Since AB 1332 took effect on January 1, 2025, California cities have had to run a pre-approved ADU plan program and post the approved plans publicly. Where a usable plan exists it can take real time and design cost out of a project, because the design has already been reviewed and only the site-specific work is left.

Links checked August 2026 and pointing at government pages. Cities change both their pages and their rules, so confirm anything current with the City of Campbell Community Development / Building Division. We deliberately do not publish Campbell permit fees or review times here: those move, they vary by project, and a number that is out of date is worse than no number at all.

Common Questions

Straight answers

Do you build in Campbell?
Yes. Campbell is inside our service area — we build across Santa Clara County and keep a deliberately tight radius so travel time doesn't come out of your project.
Do you handle the Campbell permit process?
Yes. We carry the submittal and the plan-check corrections. Requirements and review times differ from city to city, and Campbell is its own jurisdiction with its own process — chasing that is our job, not yours.
What does building in Campbell cost?
Our minimum project size is $20,000. Published ranges run up to $490K on additions and whole-home work, and ground-up new construction is priced per square foot. Every range and a cost calculator are on our resources page.

Building in Campbell?

Book a 30-minute discovery call and we'll tell you what's realistic — scope, budget and timeline — whether or not we're the right builder for it.