Santa Clara County
General Contractor in Mountain View
New construction, ADUs, additions and whole-home renovations — built and permitted by a licensed general contractor working in Mountain View.
- Licensed CA General B #1112902
- Fully Insured
Building in Mountain View
Every city in our area is its own jurisdiction with its own review process. What's true in one does not carry across the city line — which is why this page exists rather than a single generic service-area page.
Lot sizes in Mountain View vary sharply between neighborhoods, so whether a detached ADU or an addition is the better move is genuinely a per-parcel question. It is worth answering before you pay anyone to draw something.
Mountain View is the friendliest jurisdiction on our map for a single-family project, and it says so deliberately. The City states that it does not have discretionary design review for single-family homes and does not require noticing adjacent neighbours of construction — explicitly as an effort to reduce cost, time and process for homeowners. Meet the development standards for your zoning district and, with narrow exceptions, no Planning Division permit is needed at all. After Cupertino's two-storey hearings and Campbell's review board, that is a genuinely different experience.
The trade is that the numbers do the work instead, so they have to be right. Floor area ratio comes from a published formula: FAR = 0.50 − (0.00001 × lot area). A lot of 5,000 square feet or less is capped at 0.45, a lot of 10,000 square feet or more at 0.40, and anything between runs the formula. Front setback is 20 feet to the first-floor wall, with another five feet required for a second storey over an attached garage that projects forward. Rear setbacks step back as you go up: 20% of lot depth or 15 feet on the first storey, 25% or 20 feet on the second. Half the front setback area has to stay permanently landscaped, and street trees are required in front of every new home.
Two practical things. No discretionary review does not mean fast: the City puts a typical addition or remodel permit at three to eight months depending on scope, and an ADU at four to six months — and an ADU here needs no planning permit at all, just the building permit. Separately, Mountain View issues same-day online permits with no plan set for like-for-like work such as an AC unit, an EV charger, a furnace swap or a heat pump. Worth knowing before anyone charges you for a drawing you did not need.
City staff encourage sharing informal plans with Planning and Public Works before anything is drafted for permit. We take them up on that, because in a city with no discretionary review the only thing that delays you is a plan that does not meet a standard, and that is entirely preventable.
We work throughout Mountain View — whether you're in Downtown Mountain View on Castro Street, Cuesta Park, Old Mountain View, or North Bayshore, the build is the same standard.
Permits. Work in Mountain View is permitted through the City of Mountain View Building Division. We carry the submittal and the plan-check corrections — that is our job, not yours.
What Fits Here
What we build in Mountain View
New Construction
New Construction in Mountain View, built and permitted by a licensed general contractor.
Learn more →ADUs
ADUs in Mountain View, built and permitted by a licensed general contractor.
Learn more →Home Additions
Home Additions in Mountain View, built and permitted by a licensed general contractor.
Learn more →Whole-Home Remodels
Whole-Home Remodels in Mountain View, built and permitted by a licensed general contractor.
Learn more →Budget
What a Mountain View project costs
We publish our real ranges rather than making you book a call to find them out, and our minimum project size is $20,000. What moves a number in Mountain View is rarely the finishes — it is the site, the utilities and what turns up once something is opened.
Public record
Permits and ADU rules in Mountain View
These are links to the city's own pages, not our summary of them. We carry the submittal and the plan-check corrections on a project we build, so this is not information you have to act on yourself. It is here because you should be able to check it either way.
Mountain View runs a dedicated development-permits site separate from the main city site, and ADUs need a building permit but no planning permit.
Pre-approved ADU plans. Mountain View runs a pre-approved ADU plan program and is still building out its public gallery. Since AB 1332 took effect on January 1, 2025, California cities have had to run a pre-approved ADU plan program and post the approved plans publicly. Where a usable plan exists it can take real time and design cost out of a project, because the design has already been reviewed and only the site-specific work is left.
- Accessory dwelling units, City of Mountain View
- Mountain View local ADU rules, Santa Clara County ADU
Links checked August 2026 and pointing at government pages. Cities change both their pages and their rules, so confirm anything current with the City of Mountain View Building Division. We deliberately do not publish Mountain View permit fees or review times here: those move, they vary by project, and a number that is out of date is worse than no number at all.
Common Questions
Straight answers
Do you build in Mountain View?
Do you handle the Mountain View permit process?
What does building in Mountain View cost?
Before you hire anyone
Worth knowing before you sign in Mountain View
- The same project is a different project in each of these 16 cities What actually changes at a city line, Mountain View included — hearings, tree permits, fire districts and the thresholds nobody mentions.
- How big a deposit can a contractor legally ask for? California caps it at $1,000. Most people are asked for far more.
- How to check a contractor's license before you sign The CSLB lookup, and what a suspended bond actually means.
- Change orders and allowances, explained Where a fixed price stops being fixed, and what should be in writing.
- Why two ADU quotes can be $80K apart Fixed soft costs are most of the answer.
- Can I build an ADU on my lot? Setbacks, access, utilities and service capacity — a per-parcel answer.
- What changed in California ADU law on 1 January 2026 Mountain View now owes you a completeness decision in 15 business days, or the application is deemed complete.
- How big can my ADU actually be? State law caps how small Mountain View is allowed to cap you — 850 sq ft, or 1,000 with more than one bedroom.
- The inspection found unpermitted work. Now what? Three routes, and the one question to settle before you negotiate.
Nearby
Other cities we build in
Building in Mountain View?
Book a 30-minute discovery call and we'll tell you what's realistic — scope, budget and timeline — whether or not we're the right builder for it.