Elusive Construction logo Elusive ConstructionLic #1112902
Home under construction with the Elusive Construction site sign

Santa Clara County

General Contractor in Palo Alto

New construction, ADUs, additions and whole-home renovations — built and permitted by a licensed general contractor working in Palo Alto.

  • Licensed CA General B #1112902
  • Fully Insured
Home  /  Palo Alto, CA

Building in Palo Alto

Every city in our area is its own jurisdiction with its own review process. What's true in one does not carry across the city line — which is why this page exists rather than a single generic service-area page.

Palo Alto has its own utilities department and a review process with a reputation for being thorough. Older neighborhoods also carry tree protections that can affect where a foundation or an ADU can physically go — worth checking before design, not after.

We work throughout Palo Alto — whether you're in Old Palo Alto, Crescent Park, Midtown, Barron Park, or College Terrace, the build is the same standard.

Permits. Work in Palo Alto is permitted through the City of Palo Alto Development Services Department (Building Division). We carry the submittal and the plan-check corrections — that is our job, not yours.

Budget

What a Palo Alto project costs

We publish our real ranges rather than making you book a call to find them out, and our minimum project size is $20,000. What moves a number in Palo Alto is rarely the finishes — it is the site, the utilities and what turns up once something is opened.

Work out a range for your project

Public record

Permits and ADU rules in Palo Alto

These are links to the city's own pages, not our summary of them. We carry the submittal and the plan-check corrections on a project we build, so this is not information you have to act on yourself. It is here because you should be able to check it either way.

Palo Alto is all-digital and takes no paper plan submittals. Applications run through its Accela Citizen Access portal, starting with a pre-application.

Pre-approved ADU plans. Palo Alto runs a pre-approved ADU plan program and is still building out its public gallery. Since AB 1332 took effect on January 1, 2025, California cities have had to run a pre-approved ADU plan program and post the approved plans publicly. Where a usable plan exists it can take real time and design cost out of a project, because the design has already been reviewed and only the site-specific work is left.

Links checked August 2026 and pointing at government pages. Cities change both their pages and their rules, so confirm anything current with the City of Palo Alto Development Services Department (Building Division). We deliberately do not publish Palo Alto permit fees or review times here: those move, they vary by project, and a number that is out of date is worse than no number at all.

Common Questions

Straight answers

Do you build in Palo Alto?
Yes. Palo Alto is inside our service area — we build across Santa Clara County and keep a deliberately tight radius so travel time doesn't come out of your project.
Do you handle the Palo Alto permit process?
Yes. We carry the submittal and the plan-check corrections. Requirements and review times differ from city to city, and Palo Alto is its own jurisdiction with its own process — chasing that is our job, not yours.
What does building in Palo Alto cost?
Our minimum is $20,000 and most projects run between $20,000 and $350,000+. Published ranges and a cost calculator are on our resources page.

Building in Palo Alto?

Book a 30-minute discovery call and we'll tell you what's realistic — scope, budget and timeline — whether or not we're the right builder for it.